Is the manufacturer of a plant/machine obliged to supply the risk assessment to his customers?

In accordance with the Machinery Directive 2006/42/EC, each plant/machine manufacturer is obliged to produce a risk assessment in accordance with Annex I of the MD. The risk assessment is part of the mechanical documentation of any plant/machine, and also of partly completed machinery under the terms of the MD. Technical documents must always be held in readiness by the manufacturer, so that they can be presented to the relevant authorities in timely manner on demand.


However, the risk assessment is not included in the technical documentation supplied by the machine manufacturer. Supply of the risk assessment can and should be agreed as part of the contract.

 

Headoffice

Pilz GmbH & Co. KG
Felix-Wankel-Straße 2
73760 Ostfildern
Germany

Telephone: +49 711 3409-0
E-Mail: pilz.gmbh@pilz.de

Technical Support

Telephone: +49 711 3409 444
E-Mail: support@pilz.com

Americas

  • United States (toll-free): +1 877-PILZUSA (745-9872)
  • Canada: +1 888-315-PILZ (315-7459)
  • Brazil: + 55 11 4942-7028
  • Mexico: +52 55 5572 1300

Europe

  • Finland: +358 10 3224030 / +45 74436332
  • Ireland: +353 21 4804983
  • Italy: +39 0362 1826711
  • Netherlands: +31 347 320477
  • Turkey: +90 216 5775552
  • France (toll-free): +33 3 88104000
  • United Kingdom: +44 1536 462203
  • Russia: +74956654993
  • Denmark: +45 74436332
  • Austria: +43 1 7986263-444
  • Germany: +49 711 3409 444
  • Belgium: +32 9 321 75 75
  • Spain: +34 938497433
  • Sweden: +46 300 13990 / +45 74436332
  • Switzerland: +41 62 88979 30

Asia Pacific

  • Taiwan: +886 2 25681600
  • China: +86 21 60880878-216
  • Japan: +81 45 471 2281
  • Australia: +61 3 9560 0621
  • New Zealand: +64 9 6345350
  • South Korea: +82 31 778 3390