Global Site | english

CE marking

Is the manufacturer of a plant/machine obliged to supply the risk assessment to his customers?

In accordance with the Machinery Directive 2006/42/EC, each plant/machine manufacturer is obliged to produce a risk assessment in accordance with Annex I of the MD. The risk assessment is part of the mechanical documentation of any plant/machine, and also of partly completed machinery under the terms of the MD. Technical documents must always be held in readiness by the manufacturer, so that they can be presented to the relevant authorities in timely manner on demand.


However, the risk assessment is not included in the technical documentation supplied by the machine manufacturer. Supply of the risk assessment can and should be agreed as part of the contract.

 

Headoffice

Pilz GmbH & Co. KG
Felix-Wankel-Straße 2
73760 Ostfildern
Germany

Telephone: +49 711 3409-0
E-Mail: pilz.gmbh@pilz.de

Technical Support

Telephone: +49 711 3409 444
E-Mail: support@pilz.com

Americas

  • Mexico: +52 55 5572 1300
  • Canada: +1 888-315-PILZ (315-7459)
  • United States (toll-free): +1 877-PILZUSA (745-9872)
  • Brazil: + 55 11 4942-7028

Europe

  • Denmark: +45 74436332
  • United Kingdom: +44 1536 462203
  • Austria: +43 1 7986263-444
  • Belgium: +32 9 321 75 70
  • Switzerland: +41 62 88979 32
  • Sweden: +46 300 13990 / +45 74436332
  • Italy: +39 0362 1826711
  • Germany: +49 711 3409 444
  • Spain: +34 938497433
  • Finland: +358 10 3224030 / +45 74436332
  • Turkey: +90 216 5775552
  • Netherlands: +31 347 320477
  • France (toll-free): +33 3 88104000
  • Ireland: +353 21 4804983
  • Russia: +7 495 6654993

Asia Pacific

  • Australia: +61 3 9560 0621
  • Taiwan: +886 2 25700068
  • Japan: +81 45 471 2281
  • New Zealand: +64 9 6345350
  • South Korea: +82 31 778 3390
  • China: +86 21 60880878-216