After supply voltage is applied, the period that elapses before the unit is ready for operation.
After supply voltage is applied, the period that elapses before the unit is ready for operation.
Pilz Taiwan Ltd.
10F, No.36, Sec.3, Bade Rd., Songshan Dist.
Taipei City 105608
Taiwan
Telephone: +886 2 25700068
E-Mail: info@pilz.tw
Telephone: +886 2 25700068
E-Mail: info@pilz.tw