After supply voltage is applied, the period that elapses before the unit is ready for operation.
After supply voltage is applied, the period that elapses before the unit is ready for operation.
Pilz Slovakia s.r.o.
Ludvíka Svobodu 2674/1
058 01 Poprad
Slovakia
Telephone: +421 52 772 8201
E-Mail: info@pilz.sk
Telephone: +421 911 954 200
E-Mail: info@pilz.sk